Industrial and manufacturing facilities face complex grid connection challenges as they decarbonise processes and electrify heat and production at scale.
Developed a phased electrification masterplan for a 90MW steel manufacturing facility, enabling a 40% reduction in carbon intensity while securing grid connection at target cost.
Originated and structured renewable PPAs for five industrial facilities totalling 350MW, delivering cost certainty and RE100 compliance across the portfolio.
A guide for industrial operators navigating the grid, regulatory, and commercial challenges of electrification — from load assessment to PPA execution.
Read the report →