The transition to electric mobility depends on one thing above all: reliable grid connections delivered at the pace of network rollout.
Developed and managed grid connections for 42 rapid charging hubs across France, Germany, and the Netherlands, reducing average connection time by 40%.
Designed a shared substation framework for a consortium of EV operators on a major motorway corridor, reducing combined capital expenditure by £8M.
A practical guide to securing fast, cost-effective grid connections for large EV charging portfolios — from site selection to energisation.