Selected examples of Heinnsof's work in practice — illustrating our approach to grid connection strategy, programme delivery, and regulatory navigation.

CASE STUDY

Latest Case Studies

Case Study
14-Month Timeline Compression, 40MW Data Centre, Western Europe
How we compressed a hyperscaler's grid connection timeline by 14 months through early network operator engagement and a phased connection approach.
Request access →
Case Study
Grid Connection for €2.4B Petrochemical Complex, Southern Europe
Securing a 120MW connection in a constrained network area for a major new petrochemical processing campus — compressing the programme by 22 months.
Request access →
Case Study
NHS Trust Net Zero Energy Strategy, 14 Sites
Developing a whole-estate net zero energy strategy for a large NHS trust, identifying £8.2M in annual savings and a pathway to carbon neutrality by 2040.
Request access →
Case Study
Flare Gas Recovery Programme, 120MW, North Africa
Structuring a 120MW flare gas-to-power programme for a national oil company — creating revenue while reducing flaring intensity by 94%.
Request access →